Holiday Transit Schedule
New Year’s Day: All services will offer a Sunday service schedule.
Memorial Day: BREEZE, LIFT, FLEX services will offer a Saturday service schedule. COASTER and SPRINTER services will offer a Sunday service schedule.
Independence Day: All services will offer a Saturday service schedule.
Labor Day: BREEZE, LIFT, FLEX will offer a Saturday service schedule. COASTER and SPRINTER will offer Sunday service schedule.
Thanksgiving Day: All services will offer a Sunday service schedule.
Christmas Day: All services will offer a Sunday service schedule.
Only holidays with modified services are listed above. All other holidays operate on that day’s regular schedule.
Proposed 2026 – 2027 Absolute Work Windows
| 2026 Dates |
Current Planned Project Assignments |
AWW Limits |
| January 10 and 11 |
DMB5, BLDT |
CP Songs MP 209.2 to CP Broadway |
| January 24 and 25 |
DMB5, BLDT, SOPDT2 |
CP Songs MP 209.2 to CP Broadway |
| February 21 and 22 |
DMB5, BLDT, SOPDT2 |
CP Songs MP 209.2 to CP Broadway |
| March 7 and 8 |
DMB5, BLDT, SOPDT2 |
CP Songs MP 209.2 to CP Broadway |
| March 21 and 22 |
DMB5, BLDT, SOPDT2 |
CP Del Mar MP 243.92 to CP Broadway |
| September 12 and 13 |
DMB5, BLDT, SOPDT2 |
CP Songs MP 209.2 to CP Broadway |
| November 7 and 8 |
DMB5, BLDT, SOPDT2 |
CP Songs MP 209.2 to CP Broadway |
| 2027 Dates: January 9 and 10 |
BLDT |
CP Songs MP 209.2 to CP Broadway |
| January 23 and 24 |
BLDT |
CP Songs MP 209.2 to CP Broadway |
| February 20 and 21 |
BLDT |
CP Songs MP 209.2 to CP Broadway |
| March 6 and 7 |
BLDT |
CP Songs MP 209.2 to CP Broadway |
| September AWW (TBD) |
BLDT |
CP Songs MP 209.2 to CP Broadway |
| November 6 and 7 |
BLDT |
CP Songs MP 209.2 to CP Broadway |
Project Legend
- DMB5 – Del Mar Bluffs Phase 5
- SDDT – San Dieguito Lagoon Double Track
- SOPDT2 – San Onofre to Pulgas DT Ph2
- BLDT – Batiquitos Lagoon Double Track
- MOW – Maintenance of Way
- Sig Opt – Signal Optimization
- Bridge 207.6 Spans 26 and 27 Bearing Repair