Translation Disclaimer

Select a language using the Google Translate feature to change the text on this site into other languages.

*We cannot guarantee the accuracy any information translated through Google Translate. This translation feature is offered as an additional resource for information.

If information is needed in another language, contact (760) 966-6500.

Si necesita información en otro idioma, comuníquese al (760) 966-6500.
如果需要其他语种的信息,请致电 (760) 966-6500
如需其他語言版本的資訊,請致電 (760) 966-6500
Nếu cần thông tin bằng ngôn ngữ khác, xin liên hệ số (760) 966-6500.
Kung kailangan ang impormasyon sa ibang wika, makipag-ugnayan sa (760) 966-6500.
정보가 다른 언어로 필요하시다면 760-966-6500로 문의해 주십시오.

SPRINTER Station Parking Lots

SPRINTER Station Parking Lots
blue box

A redevelopment assessment of the SPRINTER corridor was conducted in 2020 to assess the feasibility for redevelopment of underutilized station parking lots.

The study prioritized seven of the 10 SPRINTER stations in between Oceanside Transit Center and Escondido Transit Center for redevelopment that best aligned with local goals and NCTD policies, including the following stations.

Oceanside SPRINTER Stations

Melrose Drive

At the intersection of Oceanside Blvd. and Melrose Drive, the Melrose Drive Station is in close proximity to retail and employment opportunities in North County. It is a single parcel totaling 109,591 square feet.

Status: Due diligence

Acres: 2.516

Proposed Features

• 420 affordable housing units

• Neighborhood park, pedestrian walkway and enhanced transit walking areas

• Transit dedicated parking spaces

 


Rancho Del Oro

The Rancho Del Oro Station is near commercial and industrial hubs and is a single parcel totaling 93,215 square feet. The project will replace 24 parking spaces and two on-site bus bays and operator restrooms.

Status: Due diligence

Acres: 2.14

Proposed Features

• 98 affordable housing units

• 8,000 square feet of retail space

• Public plaza, wide paseos for pedestrians and numerous cyclist amenities

• Transit dedicated parking spaces

• Enhanced station waiting areas

• Improved bus infrastructure and bus operator restrooms


Crouch

The Crouch Street Station is located at the intersection of Oceanside Boulevard and Skylark Drive and is a single parcel with an irregular shape that stretches along the railway from its intersection with Crouch Street to the West.

Status: Under evaluation

Acres: 2.033

Proposed Features

• At least 28 parking spaces

• Attractive to smaller/regional developers

• Possibility for greater percentage of affordable units


Coast Highway

Blocks from the ocean, Coast Highway Station is located near Oceanside Boulevard, Cleveland Street, and Interstate 5 with quick access to the Oceanside Pier. It is composed of 5 parcels totaling 39,101 square feet.

Status: Under evaluation

Acres: 0.898

Proposed Features

• At least 20 parking spaces

• Attractive to smaller/regional developers

• Possibility for greater percentage of affordable units

 

What’s Next

A request for proposal (RFP) for four Oceanside SPRINTER stations including Coast Highway Station, Melrose Station, Crouch Station and Rancho Del Oro Station, was issued on May 9, 2023. Proposals were received on August 28, 2023, and evaluated by a Source Selection Committee. On May 16, 2024, the NCTD Board authorized negotiations with USA Properties Fund Inc., and Waterford Property Company, a general partnership, for the Melrose Station and S.V.D.P. Management Inc. (Father Joe’s Villages) for the Rancho Del Oro Station.

San Marcos SPRINTER Stations

Palomar College

A redevelopment request for proposal for the Palomar College SPRINTER station in the city of San Marcos is anticipated to be released in early Fiscal Year 2025.

Acres: 1.955

Proposed Features

• Attractive to smaller/regional developers

• Possibility for greater percentage of affordable units

Vista SPRINTER Stations

Vista Transit Center

The City of Vista received grant funding to evaluate grade separation opportunities for the Vista Transit Center and vicinity. NCTD is also undertaking further analysis of infrastructure needs to improve BREEZE speed and reliability at this frequently used SPRINTER Station. To provide time for these studies to inform a future site plan, a request for proposal for this site is paused until the studies are complete.

Status: Under evaluation

Acres: 2.028


Civic Center Vista

The Vista Civic Center site is comprised of two parcels totaling 73,309 square feet. The project will be a transformational mixed-use, transit-oriented development providing ground floor activation.

Status: Under evaluation

Acres: 2.181

Proposed Features

• At least 38 parking spaces

• Attractive to smaller/regional developers

• Possibility for greater percentage of affordable units

 

What’s Next

It is anticipated that the Vista SPRINTER station projects will be brought to the NCTD Board for approval in Fall 2024.