Translation Disclaimer

Select a language using the Google Translate feature to change the text on this site into other languages.

*We cannot guarantee the accuracy any information translated through Google Translate. This translation feature is offered as an additional resource for information.

If information is needed in another language, contact (760) 966-6500.

Si necesita información en otro idioma, comuníquese al (760) 966-6500.
如果需要其他语种的信息,请致电 (760) 966-6500
如需其他語言版本的資訊,請致電 (760) 966-6500
Nếu cần thông tin bằng ngôn ngữ khác, xin liên hệ số (760) 966-6500.
Kung kailangan ang impormasyon sa ibang wika, makipag-ugnayan sa (760) 966-6500.
정보가 다른 언어로 필요하시다면 760-966-6500로 문의해 주십시오.

Batiquitos Lagoon Double Track

Batiquitos Lagoon Double Track
blue box

The purpose of this project is to replace the wooden trestle bridge to provide an area for trains to pass and for the lagoon tidal flow to improve due to a wider channel underneath the bridge, and improve overall lagoon health.

The double tracking will increase the efficiency and reliability of the Los Angeles-San Diego-San Luis Obispo (LOSSAN) coastal rail corridor,  to accommodate existing train volumes and provide for future passenger and freight demand.

Status: Shovel Ready

Replacement of Bridge 234.8

  • Mitigates impacts of sea level rise
  • Current bridge susceptible to washout

0.8 miles of new double track

  • Enhances capacity to accommodate planned passenger and freight services increases